| État de disponibilité: | |
|---|---|
Dragonstage
Poids d'emballage: 3900kg
Volume d'emballage: 51cbm
| Article | Spécification (SQure Truss) | Qté | ||||||
| longueur | tube principal (mm) | taille (mm) | ||||||
| Poutre de 14,00 m (avant) | 3 ensembles | 3,00 m | 50 × 4,0 | CS520 × 760 | 12pcs | |||
| 2,00 m | 50 × 4,0 | CS520 × 760 | 3pcs | |||||
| 1,00 m | 50 × 4,0 | CS520 × 760 | 0pcs | |||||
| Poutre de 20,00 m (côté) | 2 ensembles | 3,00 m | 50 × 4,0 | CS520 × 760 | 12pcs | |||
| 2,00 m | 50 × 4,0 | CS520 × 760 | 0pcs | |||||
| 1,00 m | 50 × 4,0 | CS520 × 760 | 4pcs | |||||
| Pilier de 5,00 m | 6 ensembles | 3,00 m | 50 × 3,0 | CS389 × 389 | 6pcs | |||
| 2,00 m | 50 × 3,0 | CS389 × 389 | 6pcs | |||||
| 1,00 m | 50 × 3,0 | CS389 × 389 | 0pcs | |||||
| cube de poutre | 6 visages | CS520 × 760 | 0pcs | |||||
| Tour d'image | Bloc de manche de robinet l | 6pcs | ||||||
| Base en acier L | 6pcs | |||||||
| Section supérieure L | 6pcs | |||||||
| Hoist manuel, BA05 2TONS | 6pcs | |||||||
| Section de charnière de robinet, hauteur 1m | 6pcs | |||||||
| Élingue de fibres, BA04,2 tonnes 3M | 6pcs | |||||||
| SURGIGNAGE Long | 24pcs | |||||||
| Article | Spécification (SQure Truss) | Qté | ||||||
| longueur | tube principal (mm) | taille (mm) | ||||||
| Pilier | 3 ensembles | 1,40 m | 50 × 3,0 | CS289 × 289 | 3pcs | |||
| Boutre de haut de 20,00 m | 1 ensembles | 3,00 m | 50 × 3,0 | CS289 × 289 | 6pcs | |||
| 2,00 m | 50 × 3,0 | CS289 × 289 | 0pcs | |||||
| 1,00 m | 50 × 3,0 | CS289 × 289 | 2pcs | |||||
| Poutre oblique de 7,20 m | 6 ensembles | 3,00 m | 50 × 3,0 | CS289 × 289 | 6pcs | |||
| 2,00 m | 50 × 3,0 | CS289 × 289 | 6pcs | |||||
| 2,20 m | 50 × 3,0 | CS289 × 289 | 6pcs | |||||
| Bouchette d'échelle de 7,20 m | 16 ensembles | 3,00 m | 50 × 3,0 | CL30 289 * 50 | 16pcs | |||
| 2,00 m | 50 × 3,0 | CL30 289 * 50 | 16pcs | |||||
| 2,20 m | 50 × 3,0 | CL30 289 * 50 | 16pcs | |||||
| Composants de toit | 4 | Roof Conner 4 façons, utilisation pour la ferme de faisceau de toit | CS289 × 289 | 2pcs | ||||
| 5 | Roof Conner 5 façons, utilisation pour la ferme de faisceau de toit | CS289 × 289 | 1pcs | |||||
| 1 | Plaque de connexion à la pince | CS289 × 289 | 3pcs | |||||
| Pince unique | 32pcs | |||||||
| Pince à double | 12pcs | |||||||
| Matériau de la canopée du toit: PVC, couleur bleue ou personnalisée. | 409.36 | 1pcs | ||||||
Poids d'emballage: 3900kg
Volume d'emballage: 51cbm
| Article | Spécification (SQure Truss) | Qté | ||||||
| longueur | tube principal (mm) | taille (mm) | ||||||
| Poutre de 14,00 m (avant) | 3 ensembles | 3,00 m | 50 × 4,0 | CS520 × 760 | 12pcs | |||
| 2,00 m | 50 × 4,0 | CS520 × 760 | 3pcs | |||||
| 1,00 m | 50 × 4,0 | CS520 × 760 | 0pcs | |||||
| Poutre de 20,00 m (côté) | 2 ensembles | 3,00 m | 50 × 4,0 | CS520 × 760 | 12pcs | |||
| 2,00 m | 50 × 4,0 | CS520 × 760 | 0pcs | |||||
| 1,00 m | 50 × 4,0 | CS520 × 760 | 4pcs | |||||
| Pilier de 5,00 m | 6 ensembles | 3,00 m | 50 × 3,0 | CS389 × 389 | 6pcs | |||
| 2,00 m | 50 × 3,0 | CS389 × 389 | 6pcs | |||||
| 1,00 m | 50 × 3,0 | CS389 × 389 | 0pcs | |||||
| cube de poutre | 6 visages | CS520 × 760 | 0pcs | |||||
| Tour d'image | Bloc de manche de robinet l | 6pcs | ||||||
| Base en acier L | 6pcs | |||||||
| Section supérieure L | 6pcs | |||||||
| Hoist manuel, BA05 2TONS | 6pcs | |||||||
| Section de charnière de robinet, hauteur 1m | 6pcs | |||||||
| Élingue de fibres, BA04,2 tonnes 3M | 6pcs | |||||||
| SURGIGNAGE Long | 24pcs | |||||||
| Article | Spécification (SQure Truss) | Qté | ||||||
| longueur | tube principal (mm) | taille (mm) | ||||||
| Pilier | 3 ensembles | 1,40 m | 50 × 3,0 | CS289 × 289 | 3pcs | |||
| Boutre de haut de 20,00 m | 1 ensembles | 3,00 m | 50 × 3,0 | CS289 × 289 | 6pcs | |||
| 2,00 m | 50 × 3,0 | CS289 × 289 | 0pcs | |||||
| 1,00 m | 50 × 3,0 | CS289 × 289 | 2pcs | |||||
| Poutre oblique de 7,20 m | 6 ensembles | 3,00 m | 50 × 3,0 | CS289 × 289 | 6pcs | |||
| 2,00 m | 50 × 3,0 | CS289 × 289 | 6pcs | |||||
| 2,20 m | 50 × 3,0 | CS289 × 289 | 6pcs | |||||
| Bouchette d'échelle de 7,20 m | 16 ensembles | 3,00 m | 50 × 3,0 | CL30 289 * 50 | 16pcs | |||
| 2,00 m | 50 × 3,0 | CL30 289 * 50 | 16pcs | |||||
| 2,20 m | 50 × 3,0 | CL30 289 * 50 | 16pcs | |||||
| Composants de toit | 4 | Roof Conner 4 façons, utilisation pour la ferme de faisceau de toit | CS289 × 289 | 2pcs | ||||
| 5 | Roof Conner 5 façons, utilisation pour la ferme de faisceau de toit | CS289 × 289 | 1pcs | |||||
| 1 | Plaque de connexion à la pince | CS289 × 289 | 3pcs | |||||
| Pince unique | 32pcs | |||||||
| Pince à double | 12pcs | |||||||
| Matériau de la canopée du toit: PVC, couleur bleue ou personnalisée. | 409.36 | 1pcs | ||||||
Foshan Dragon Stage
N ° 7, Zone industrielle Xiaxi, Heshun, District de Nanhai, Foshan, 528241, Guangdong, Chine.
+86 136 3132 8997
Copyright © 2020 Foshan Dragon Stage Equipment Co., Ltd备案: 粤 ICP 备 2020113505