| État de disponibilité: | |
|---|---|
Dragon Stage
Poids d'emballage: 2450kg
Volume d'emballage: 35cbm
| Article | Spécification (SQure Truss) | Qté | ||||||
| longueur | tube principal (mm) | taille (mm) | ||||||
| Poutre de 20,00 m (avant) | 3 ensembles | 3,00 m | 50 × 3,0 | CS500 × 600 | 18 pcs | |||
| 2,00 m | 50 × 3,0 | CS500 × 600 | 3pcs | |||||
| 1,00 m | 50 × 3,0 | CS500 × 600 | 0pcs | |||||
| Poutre de 17,00 m (côté) | 2 ensembles | 3,00 m | 50 × 3,0 | CS500 × 600 | 10pcs | |||
| 2,00 m | 50 × 3,0 | CS500 × 600 | 2pcs | |||||
| 1,00 m | 50 × 3,0 | CS500 × 600 | 0pcs | |||||
| 8,00 m pilier | 6 ensembles | 3,00 m | 50x3.0 | CS350 × 350 | 12pcs | |||
| 2,00 m | 50x3.0 | CS350 × 350 | 6pcs | |||||
| 1,00 m | 50x3.0 | CS350 × 350 | 0pcs | |||||
| cube de poutre | Cube de robinet 500x600 | 0pcs | ||||||
| Tour d'image | Bloc de manche de robinet m | 6pcs | ||||||
| Base en acier m | 6pcs | |||||||
| Section supérieure M | 6pcs | |||||||
| Hoist manuel, BA05 2TONS | 6pcs | |||||||
| Section de charnière de robinet, hauteur 1m | 6pcs | |||||||
| Élingue de fibres, BA04,2 tonnes 3M | 6pcs | |||||||
| SURGIGNAGE Long | 24pcs | |||||||
Poids d'emballage: 2450kg
Volume d'emballage: 35cbm
| Article | Spécification (SQure Truss) | Qté | ||||||
| longueur | tube principal (mm) | taille (mm) | ||||||
| Poutre de 20,00 m (avant) | 3 ensembles | 3,00 m | 50 × 3,0 | CS500 × 600 | 18 pcs | |||
| 2,00 m | 50 × 3,0 | CS500 × 600 | 3pcs | |||||
| 1,00 m | 50 × 3,0 | CS500 × 600 | 0pcs | |||||
| Poutre de 17,00 m (côté) | 2 ensembles | 3,00 m | 50 × 3,0 | CS500 × 600 | 10pcs | |||
| 2,00 m | 50 × 3,0 | CS500 × 600 | 2pcs | |||||
| 1,00 m | 50 × 3,0 | CS500 × 600 | 0pcs | |||||
| 8,00 m pilier | 6 ensembles | 3,00 m | 50x3.0 | CS350 × 350 | 12pcs | |||
| 2,00 m | 50x3.0 | CS350 × 350 | 6pcs | |||||
| 1,00 m | 50x3.0 | CS350 × 350 | 0pcs | |||||
| cube de poutre | Cube de robinet 500x600 | 0pcs | ||||||
| Tour d'image | Bloc de manche de robinet m | 6pcs | ||||||
| Base en acier m | 6pcs | |||||||
| Section supérieure M | 6pcs | |||||||
| Hoist manuel, BA05 2TONS | 6pcs | |||||||
| Section de charnière de robinet, hauteur 1m | 6pcs | |||||||
| Élingue de fibres, BA04,2 tonnes 3M | 6pcs | |||||||
| SURGIGNAGE Long | 24pcs | |||||||
Foshan Dragon Stage
N ° 7, Zone industrielle Xiaxi, Heshun, District de Nanhai, Foshan, 528241, Guangdong, Chine.
+86 136 3132 8997
Copyright © 2020 Foshan Dragon Stage Equipment Co., Ltd备案: 粤 ICP 备 2020113505